Carbon Injection Nozzle-Steel Industry

Bypass and Original Lines Gerdau Ameristeel, NJ was having long standing problem of maintenance in their carbon transfer lines.
Read More»

Burner Nozzles-Tarong Station

Pulverized fuel conveying is a process which encounters a lot of wear caused by erosion.
Read More»

Sand erosion- Shell Sabah Platform

Cyclone pipingFor many years, sand erosion is one of the most significant major problems faced in oil and gas industries throughout the world.
Read More»

Orifice Plate Saves $12,000 Annually

A 2” alumina ceramic valve in use at the a cogeneration plant in New York had to be replaced four times a year due to severe erosion.
Read More»

Ceramic-Lined Pipe Clearly Superior

Original Damaged Steel PipeCeresist Ceramic-Lined Replacement PipeA recent head-to-head showdown clearly indicated that a ceramic-lined pipe will far outlast a double-thickness carbon-steel pipe.
Read More»

Our Guarantee

Our innovative designs allow us to guarantee increased uptime, less failures and huge cost savings.

TAKE THE CERESIST DOUBLE LONGEVITY CHALLENGE! Go >